Benefits for your plant
Timely structural reinforcement and specialized concrete repairs protect the plant's load-bearing structure from aging and wear, enabling it to withstand heavier industrial loads. Benefits include preventing hazardous collapses, extending the lifecycle of civil assets, and ensuring the seamless, safe continuation of production.
Why choose TALOS GC
TALOS GC combines construction and reinforcement expertise with uncompromising safety standards. Through our consultancy services and extensive experience, we provide solutions that minimize future renovation costs and ensure uninterrupted growth in client output and profitability.
Our experience
TALOS carries out specialized dismantling of obsolete industrial stacks and structures, non-explosive structural demolition, and rockfall mitigation and slope stabilization in quarrying and mining infrastructure.
Our civil works teams deliver concrete repairs, shotcrete and reinforcement, steel structure erection, staircases and cladding, and industrial pavement repairs — keeping plants operational while the work is carried out.
We are also engaged as part of emergency response teams after structural failures, inspecting, stabilizing and safely clearing collapsed sections.
Related case studies
Stabilization and Reinforcement of Cement Silos
Structural inspection, emergency stabilization and internal reinforcement of six 25 m cement silos showing deterioration of the outer shell.
Read the case study
Cement Mill Roof Demolition
Emergency response after the partial collapse of a cement mill roof: drone inspection, stabilization with a 250 t crane and safe removal of debris.
Read the case study
Raw Mill Bucket Elevator — Concrete Repairs
Assessment and custom-engineered repair of cracked precast concrete housing on a raw mill bucket elevator, from an anchored scaffolding tower.
Read the case study
Rigid Pavement Repairs at a Cement Factory
GPS-mapped survey and reinforced concrete repairs of a heavy-duty factory road, with traffic diverted to avoid production downtime.
Read the case study