Request a Quote
Services Projects Case Studies Global Presence About Contact Request a Quote
Power plant, Greece

Power Plant 50 m Stack Painting

Surface preparation and protective painting of a 50 m industrial stack at a power plant in Greece.

The challenge

Power plant stacks face heat, flue gases and weather on every surface. Once the coating breaks down, corrosion and concrete deterioration accelerate.

Repainting a 50 m stack means working safely over its full height, often without a full scaffold.

Scope of works

  • Access to the full height of the stack with rope access and working platforms
  • Cleaning and surface preparation of the stack shell
  • Application of a protective industrial coating system
  • Quality checks and handover

Outcome

The stack was repainted over its full height, restoring its protection. With decades of work on power plant chimneys across Greece, we offer chimney inspection, repair and painting. See also the painting of two 50 m chimneys.

Planning a shutdown or facing an emergency?

Tell us about your asset and timeline. Our engineers will propose a safe, cost-effective access and execution method.