Projects - Silos Maintenance Services

Silos Maintenance Services


Project Description

Project Info

Table of Completed Projects regarding Silo Cleaning:

TITAN Group Antea Cement Plant – Albania
• Internal removal of solidified cement in the Cement Silo No3 – (2.552 tons)
TITAN Group Patras Cement Factory:
• Internal removal of solidified cement in the Cement Silo No5
• Internal Cleaning Works of solidified material in the Silo No 1
• Internal Cleaning Works of solidified material in the Silo No 8
• Internal Cleaning Works of solidified material in the Silo No 7
TITAN Group Kamari Cement Factory:
• Removal of extra material from the roof of the F30 Silo
• Internal Cleaning Works of solidified material of the East Silo
• Internal Cleaning Works of solidified material of the West Silo
• Internal Cleaning Works of solidified material of the North Silo
• Internal Cleaning Works of Clinker Silo F11
• Internal Clinker Silo Cleaning 7.000tons (2019)
TITAN Group Crete Cement Factory:
• Inspection of 3 Silos & Cleaning Works of One Silo
• Cleaning Works of solidified cement in the Cement Silo
• Inspection & Cleaning Works of solidified material in the Silo No 2
• Cleaning Works of solidified material in the Silo No 1
• Unblockage and Cleaning Works from solidified material in the Silo No 1 & 2
TITAN Group Thessalonica Cement Factory:
• Cleaning works of the Clinker Silo MT2 & Gypsum MT2
• Cleaning Works of Silo No 7
• Internal Cleaning works in Silo No 6 at Thessalonica Cement Factory
• Cleaning works of 2 Steel Silos
• Cleaning works of the Silo No 1 of the packing complex
LAFARGE Group Aliverioy Cement Factory:
• Removal of solidified material in Silo at AGET-Heracles
TITAN GROUP Skopje Usje Factory:
• Cleaning works of 3 Concrete Silos
• Cleaning works of 2 Clinker Silos
• Cleaning works of 3 Concrete Silos (2019)
• Cleaning works of Silo 15 surrounding air-slide for removal (2019)
TITAN GROUP Bulgaria ZlatnaPanega Factory
• Cleaning of Raw Material Silo (more than 3.000 tons)
LAFARGE Group Zimbabe Cement Factory:
• Removal of cement material at Silos 3,4 & 7 at Lafarge Zimbabwe
HEIDELBERGCEMENT GROUP – HALYPS SA Cement Factory
• Cleaning of Cement material from Silo 5 (4.200 tons).