TABLE OF COMPLETED PROJECTS IN CEMENT FACTORIES REGARDING INSPECTIONS & HIGH ALTITUDE WORKS
1. PROJECT in TITAN Company: Reconstruction of the Insulation of the Stack in the Factory at Thessalonica (110m height).
2. PROJECT in TITAN Company: Inspection and installation of Polycarbonate cladding in the preheater in the Factory at Thessalonica (115m height)
3. PROJECT in TITAN Company: Replacement of the side cladding of 2 Dubrava Silos & Removal of the hardened Cement, in the Factory at Thessalonica.
4. PROJECT in TITAN Company: Inspection of inner area of 39 Silos in the Factory at Thessalonica.
5. PROJECT in TITAN Company: Removal of the mounted Cement in Silo No 6 (30m height) in the Factory at Thessalonica
6. PROJECT in TITAN Company: Inspection of Clinker Silos F12,5 at Kamaris Factory
7. PROJECT in TITAN Company: Inspection of Northern Silo at Kamaris Factory (65m height)
8. PROJECT in TITAN Company: Repair Works of the Roof in Northern Silo at Kamaris Factory of (65m height)
9. PROJECT in TITAN Company: Inspection of 14 Silos in the Factory at Elefsinas Factory.
10. PROJECT in TITAN Company: Inspection of the Coal & Exhaust Gas Ducts Steel Frame with NTD method at Patras Factory.
11. PROJECT in TITAN Company: Inspection of 46 Silos with NTD, Gas Free & ATEX directives and methods at Patras Factory.
12. PROJECT in TITAN Company: Inspection of 31 Silos with NTD methods at Elefsinas Factory.
13. PROJECT in TITAN Company Material removal with conveyor belts from Cement Silos
14. PROJECT in TITAN Company Cleaning & Painting Works in Cement Factory Silo with epoxy coatings
15. PROJECT in TITAN Company Material removal from the structure of silo and the roof.
16. PROJECT in BARILLA Company – 8 ConcreteSilo Inspection.
17. PROJECT in BARILLA Company – 4 ConcreteSilo Repair works with Penetron Materials.
18. PROJECT in INTERBETON Company: Inspection of 6 Cement Silo.
19. PROJECT in KOSOVO TITAN (SHARCCEM) – Inspection of Preheater Ducts & Raw Mill Ducts (from Inside).
20. PROJECT in TITAN Company – Inspection of Preheater Chimney (from Inside).
21. PROJECT in ALBANIA TITAN (ANTEA) – Inspection of No 3 & No 5 Silo.
22. PROJECT in TITAN Company: Inspection of 6 Silos at Kamaris Factory.